The stairs leading to the mezzanine. |
Enjoying the light and warm straw bale office! |
A new mezzanine space above the office. |
Flooring on top of the office roof. |
The roof going on top of the bales. |
Packing down the bales, note the stakes to hold the bales in place. |
The wooden bale frame with limestone gravel. |
Laying the waterproof sheeting to stop moisture getting into the bales and rotting them. |
Here's the straw bales being unloaded by architectural students from UCLAN |
New Llangelynin Church |
No comments:
Post a Comment