![]() |
The stairs leading to the mezzanine. |
![]() |
Enjoying the light and warm straw bale office! |
![]() |
A new mezzanine space above the office. |
![]() |
Flooring on top of the office roof. |
![]() |
The roof going on top of the bales. |
![]() |
Packing down the bales, note the stakes to hold the bales in place. |
![]() |
The wooden bale frame with limestone gravel. |
![]() |
Laying the waterproof sheeting to stop moisture getting into the bales and rotting them. |
![]() |
Here's the straw bales being unloaded by architectural students from UCLAN |
![]() |
New Llangelynin Church |
No comments:
Post a Comment