![]() |
| The stairs leading to the mezzanine. |
![]() |
| Enjoying the light and warm straw bale office! |
![]() |
| A new mezzanine space above the office. |
![]() |
| Flooring on top of the office roof. |
![]() |
| The roof going on top of the bales. |
![]() |
| Packing down the bales, note the stakes to hold the bales in place. |
![]() |
| The wooden bale frame with limestone gravel. |
![]() |
| Laying the waterproof sheeting to stop moisture getting into the bales and rotting them. |
![]() |
| Here's the straw bales being unloaded by architectural students from UCLAN |
![]() |
| New Llangelynin Church |










No comments:
Post a Comment